Well, that is with the transfer and without incident is such a thing. If on the date of provisional acceptance or the stairs is still fitted the heater is working properly and actually still quite a few little things need to be repaired, there is a somewhat uneasy with respect to the final, which was supposed to take place three days later. But do more than point out and talk, talk, talk We can not calculate. Anyway, we are in the course of preliminary acceptance, accompanied by our external experts during the previous audits, including the possibility of refusing Final inspection has been made aware if the stairs are not built by then and will not work the heating system would continue. Against this background, we also have the last installment held back until further notice and with Mr. Bosch agreed that we transfer the money in proportion when the work will be done.
later in the afternoon when we were in the house again, we have our eyes are not married. Everywhere craftsmen and noise: It is what did. In no time our stairs then to early evening was finished. Here's a big tribute to the artisans, for the speed they were probably at the basis of overtime to make it with us had, at most annoying and rude, but first, the human, and secondly, the staircase was then done, so that bothered us the bad mood less. In addition, the stair builders have left their jobs very clean and tidy, which in our experience does not seem to be obvious to all craftsmen. But the download completes and went even further: finally ran the heater and the broken tiles were also replaced as well as many other little things done in the following days.
At this point we want to again express to our tilers, who was incidentally also a very nice person, thanks for the excellent and professional work done.
![]() |
Here are the two masterpieces of the tile ... |
Unfortunately, a nasty side effect, which we have seen our construction manager, Mr Bosch, attention and our displeasure expressed, was the condition of the site (now It is in our eyes no more, but it is our house), some of the craftsmen have left. It's very annoying to the evening a clean house and leave the next day after a bomb attack conditions such encounters. And we are not talking about a couple of silicone or plaster remnants here and there. Surrounding cigarette butts, some cigarette ashes spread on tile and tons of garbage and filth. It's always amazing how people behave in strange houses, because we are convinced that such behavior is stored at the latest before the entry into their own home (we hope). We hereby wish to stress that it was in this case only to employees of a particular company because the only way to get there and the bathroom were themselves affected. Otherwise this was an abominable condition during the construction phase, more of a Exception. Also inexplicable why people smoke automatically and without question in the house. When one can understand the shell still, but in an almost ready for occupancy house? Here we can do to avoid unpleasant surprises, recommend future clients and non-smokers only, to distribute throughout the house smoking signs in the hope that the artisans keep to it.
![]() |
Good news: Our house has the blower-door test reached a value of 0.83. |