After all, the parquet floor is finished and a few little things, but some are things that have been criticized, not been done or fixed. On the one hand the floor. Since it was first sanded, oiled and polished and then today, we can not say anything about possible defects. Looks but in any case is already very beautiful. On the other the sink in the guest bathroom, which had to be removed as part of the tile replacement in the short term, not yet replaced. Even the front door frame with door handle is missing and the chimney must be lined (we reported several weeks ago). Then some other things like outstanding line insulation, replacing a fuse for the heating system, holes in the roof sheeting in the loft, a timer for the towel and the official training in the operation of the heat pump. Mr. Bosch promised in any case that will be taken care by the end of next week, so we brought the decrease rapidly over the stage, have received without the certificate / guarantee, since we have still retained some of the last installment. We have long considered to transfer the money immediately, but because of the experiences we have had lately, we have become somewhat cautious. We are looking forward to next week, if everything is done as promised.
![]() |
At 26.10 then the stairs were still ... |
![]() |
... and the floor was almost completed. |
![]() |
And our post now has a home. |
![]() |
our fireplace, which had to be extended and still is not covered. |
0 comments:
Post a Comment