I can still remember how we have quipped last October, because even if our chimney this year (and of course we mean the year 2010) is completed. Laughter is now passed us, because that is still our view:
Reminder: Our final was on 11/04/2010.
looks
Just as our patience is still a little put to the test. One thing is clear: the latest in the spring when we can make our next terrace, is coming off the thing, no matter what.
Another negative surprise we experienced with our heat pump. Almost two weeks we will have to content ourselves with a room temperature of 15 ° C throughout the house and that's not funny. And only after we have once again contacted by Mr. Kubiak Viebrockhaus in Kaarst did something. We were Heaters provided and Hout and Poels is paid for the additional cost of electricity, after all. Is again noted that nothing has done little to Viebrock contacted until we had. Only then the stones were brought to the roles. But the funniest was the reason for the heating failure: the Heizstabtemperaturregler was set too low, so that the heater could not reach the required temperature. More must be to say at this point, perhaps only that it had to come out extra employee NIBE. We have discussed with him about the competence of so-called specialist firms, and he told us that it was not the lack of training, but the vanishingly small number of participants this training. In our opinion, there is still enormous pent-up demand.
As for the heat pump principle, we recommend the forum of dialogue haustechnik .
Here are two links: